belt drive for ratchet shift shovel?
#2
RE: belt drive for ratchet shift shovel?
ORIGINAL: 74shovel
Has anyone put a belt secondary on an old shovel with ratchet shifter or is it possible to change the 4 speed to a rotary top?
Has anyone put a belt secondary on an old shovel with ratchet shifter or is it possible to change the 4 speed to a rotary top?
IMO, it is not worth the expence for the belt rear but the 5 speed is one of the best upgrades I did.
#4
RE: belt drive for ratchet shift shovel?
ORIGINAL: 74shovel
Has anyone put a belt secondary on an old shovel with ratchet shifter or is it possible to change the 4 speed to a rotary top?
Has anyone put a belt secondary on an old shovel with ratchet shifter or is it possible to change the 4 speed to a rotary top?
I did it on my 1974 ratchet top. I took a 31 tooth softail pulley and machined the centre out of it, then machined the teeth off an old sprocket and bolted the two together with allen bolts, leaving a big enough radius inside the bolt pattern to fit the box spanner. I needed to do a bit of clearancing of the tranny casing ( not much). I use this set up in a home made softail frame, offset for a 200 tyre on a home made wheel. The main reson I did it is because most people said it couldn't be done. It works fine!
I've tried to post some pics, but can't figure it ou yet. (BIKER, NOT BOFFIN!!!!!!!!)
[IMG]local://upfiles/10196/66661BD4004B4E9298AAA672D58F549E.jpg[/IMG]
Thread
Thread Starter
Forum
Replies
Last Post