My Modified Rocker C Project is Beginning in November
#1
My Modified Rocker C Project is Beginning in November
I did an animated mockup of what I plan to do (shows stock version to some of the planned mods) - http://www.lulays.com/harley/rocker_ani.gif
Because I am a web developer, I plan to do a web page or two on the project and I will make that link available when it is done.
DONE SO FAR
I started with the crimson red sunglow Rocker C and have the following mods done so far: Screamin Eagle stage 3; 103ci heads; 570 cams; ST2 EFI; Pro Super Tuner; Screamin Eagle high flow air intake; Compression release kit; dyno tuned at dealer; short mirrors; Harley tach/speedo combo; Danny Gray solo seat; Kury swing arm mount license plate.
ON THE WAY
I ordered the Performance Machine wheels/tires/rotors; got a stock rear fender spare that is ready to be chopped and customized; got a new front blank that is ready to chop and customize; kury chrome signals for amber rear turns; stock rear brake from Harley (for bobber style in rear fender); alternating run/amber forkerz front signals; fender paint with custom striping to match (kind of); Vance & Hines staggered short shots (played with lots of styles and this is what I thought matched the rest of the mods the best).
I've been waiting to do grips and lower controls until I get these first mods done, then I will determine what I want to get and try to get them on before the summer.
Certainly everyone will have an opinion - I make my stuff to match my taste and the things I am trying to do, within whatever budget I am trying to stay in. I've been jonesin for a Harley for a long time, and this is the bike I've been wanting to get and "tweak".
I put a gillion hours into the animation and don't plan to upload photos as I go, but will compile it all and put it on the web page(s) that I make. I am hoping to have the mockup mods done before Feb/March 2013. I did something similar when I did mods to my VTX a couple of years ago (http:www.lulays.com/vtx)
Because I am a web developer, I plan to do a web page or two on the project and I will make that link available when it is done.
DONE SO FAR
I started with the crimson red sunglow Rocker C and have the following mods done so far: Screamin Eagle stage 3; 103ci heads; 570 cams; ST2 EFI; Pro Super Tuner; Screamin Eagle high flow air intake; Compression release kit; dyno tuned at dealer; short mirrors; Harley tach/speedo combo; Danny Gray solo seat; Kury swing arm mount license plate.
ON THE WAY
I ordered the Performance Machine wheels/tires/rotors; got a stock rear fender spare that is ready to be chopped and customized; got a new front blank that is ready to chop and customize; kury chrome signals for amber rear turns; stock rear brake from Harley (for bobber style in rear fender); alternating run/amber forkerz front signals; fender paint with custom striping to match (kind of); Vance & Hines staggered short shots (played with lots of styles and this is what I thought matched the rest of the mods the best).
I've been waiting to do grips and lower controls until I get these first mods done, then I will determine what I want to get and try to get them on before the summer.
Certainly everyone will have an opinion - I make my stuff to match my taste and the things I am trying to do, within whatever budget I am trying to stay in. I've been jonesin for a Harley for a long time, and this is the bike I've been wanting to get and "tweak".
I put a gillion hours into the animation and don't plan to upload photos as I go, but will compile it all and put it on the web page(s) that I make. I am hoping to have the mockup mods done before Feb/March 2013. I did something similar when I did mods to my VTX a couple of years ago (http:www.lulays.com/vtx)
Last edited by LAZ_Rocker; 10-28-2012 at 11:41 PM.
#7
Trending Topics
#8
I dropped my bike off at my friends shop today. We will spend as many Saturdays as possible working on it I mounted the rear fender spare, removed my rear passenger pegs, and yesterday/today I removed my front stock signals and installed the forkerz and the alternating lights look pretty cool and are even brighter than I thought they would be.
I left all of my new parts, and everything is here except the wheel/tire package.
I left all of my new parts, and everything is here except the wheel/tire package.
#10
It is going much slower than I thought, but it will be done by the time summer gets here. Here is a photo with the wheels taped off (the matching pulley hasn't been installed yet). I've got lots of parts still waiting to go on.