2010 FLHX Winter Projects Done
Except for a few finishing touches I'm done...just in time for spring here in IL. Here's what I did:
And a note on the bags - they were a perfect fit. The whole project took me about 1.5 hours. No adjustments, tweaking, etc. Just bolted up the hardware and dropped them on...
Happy spring and ride safe...
- stage 1
- switched to 2009 head pipes (duals, no cats)
- klock werks wfb 3.5" mufflers w/ black tips
- dyno tune
- blacked out front end - lowered 1"
- klock werks ergo up bars - black w/ black controls
- slotted billet black mirrors
- klock werks 6.5" flare windshield
- tweeter pod
- hogtunes dash speakers
- badlander seat
- topshop 3" stretch bags
And a note on the bags - they were a perfect fit. The whole project took me about 1.5 hours. No adjustments, tweaking, etc. Just bolted up the hardware and dropped them on...
Happy spring and ride safe...
Thread
Thread Starter
Forum
Replies
Last Post
ChiliPepperGarage
Motorcycles For Sale
7
Aug 15, 2010 07:20 PM




