Apes and Chrome Front End Complete !!
Finally got to take my bike for a ride after installing Apes, Chrome Front End and Stainless Steel Cables.
12.5" Wild1 Chubby's (Internal Wiring)
1.5" Risers
HD Poly Bushings
HD Chrome Switch Housings
HD Chrome Master Cylinder
HD Chrome Levers
HD Grips
HD Chrome Front End
HD Stainless Steel Cables
Did everything myself and saved some money.
http://img.photobucket.com/albums/v6...e/DSCF4150.jpg
Mike
NY
12.5" Wild1 Chubby's (Internal Wiring)
1.5" Risers
HD Poly Bushings
HD Chrome Switch Housings
HD Chrome Master Cylinder
HD Chrome Levers
HD Grips
HD Chrome Front End
HD Stainless Steel Cables
Did everything myself and saved some money.
http://img.photobucket.com/albums/v6...e/DSCF4150.jpg
Mike
NY
ORIGINAL: CNC WHEEL GUY
Did you post in the in the "Ape Hanger ****" thread yet???
It looks good!
Did you post in the in the "Ape Hanger ****" thread yet???

It looks good!
Thanks !!
Mike
NY
Good Job Mike!! I also went with the apes + cables and all the controls over the winter...Did not due the lower forks yet...How did that go?? Probably will be next on the list!!
Trending Topics
ORIGINAL: Nostalgic07
Good Job Mike!! I also went with the apes + cables and all the controls over the winter...Did not due the lower forks yet...How did that go?? Probably will be next on the list!!
Good Job Mike!! I also went with the apes + cables and all the controls over the winter...Did not due the lower forks yet...How did that go?? Probably will be next on the list!!
The Forks went well except I stripped one of the 6mm Damper bolt Hex Head. Spent about 2 hours getting it out but other than that it's not a hard job at all but you will need to remove the entire Headlight and Lightbar assembly to get to the Pinch bolts and to swap out those Upper Covers(Cowbells).
Mike
NY



