PowerVision Install
I lifted the tank on mine to run the cable for the PW and the AT. Was pretty easy, actually only lifted it about 4-5". This gave me plenty of room to run everything very easily. I lifted the tank and slid the head of a rubber mallet under the tank to hold it up while I ran wires.
Just run the wire under the console, no need to remove the tank. You might need to loosen the clutch handle bracket to install the clamp for the PV display, the clutch cable makes it a tight fit around the handle bar. After installing the clamp, re tighten clutch bracket. The clamp I got from fuel moto placed the screen at an angle that made it impossible to read it the sun. The install took me about 15 minutes. I had mine installed for 2 days then removed it after completing the auto tune.
The PV has a lot of cool features, but it's also a distraction.
The PV has a lot of cool features, but it's also a distraction.
Thread
Thread Starter
Forum
Replies
Last Post




