winter project continues
did all the drywall, insulation, celing, lights, etc before.. this is my latest progress
did a nice paint scheme on the walls
i bought some shelving to hang my DVR and Speakers for the TV (kobalt track system) as well as the track sysytem and hooks to hang my bike stands and what not. ill be adding another track and some more hooks and stuff for my buffers.
and the main thing i worked on last night along with what i have stated above is my workbench/lower cabinet i built. its pretty beasty, its 9 foot long on the back wall and 4.6 foot long on the side wall. i still have to mount my other cabinet doors i made, and i am going to do a stainless, or diamond plate wrap for the top a too.
sweet thing about this cabinet/workbench, is my air compressor slide in the part thats along the side wall. and the end is a door, so when i need it , i open door and pull it out, and when its not in use i leave it in the cabinet, so the garage maintains a cleaner look.




Trending Topics
either the snap tiles or floor epoxy of some sort.
gotta wait till summer to do the floor, to cold for it right now.
The Best of Harley-Davidson for Lifelong Riders





