Snow is falling! Winter projects underway!
On the to do list:
-Install new rear fender (take off from older Bob)
-Modify saddlebags to be detachable (using the bolt and end nut method)
-New Alloy Arts Strut sigs
-New brake light for new fender (getting PC'd with Joe now)
-PC the horn cover and bracket (with Joe now)
-Install new (used) 14" black bars (some new cables needed)
-Relocate front sigs
-Flip mirrors
-New PC'd control housings
-I'll probably ditch the battery bag and put a black band back on there
-K&N Filter
-Jacyl tank lift
I'd also like to get a bigger headlight, but I think I have enough here to last me for now.
On like Donkey Kong! I'll post some pics here as it goes along over the next few months...

Updates 1/11:
Upates! Got the bars and everything else back in from Joe and everything looks awesome. Got the bars last night and had to get them on. Soldering tonight and then on to the rear electrical work later this week. Should have this all done by this weekend barring any issues.
PC'd horn to match new fenders:

New bars on:

Second shot:

Update: 01/21
Got everything back on and she is running awesome! Could not be more excited. I still need to do the tank lift and K&N filter but funds are a little tight again and they will have to wait until later this spring. Most fun I have ever had while working on my bike, great stuff. But for now, here she is!


Last edited by DSnoopy; Jan 21, 2012 at 02:32 PM.
Trending Topics
The Best of Harley-Davidson for Lifelong Riders


